Demolition services in Fort Collins, Colorado by Stormheart Construction

Dirt Removal services in Fort Collins, Colorado with Stormheart Construction? Cable, pipe, and service plans should be used to ensure that underground services are known so they can be marked on the ground or, ideally, the area avoided entirely. Around the areas where there are underground services, mechanical equipment should be avoided and instead use spades and/or shovels. Picks and forks should be avoided as they are more likely to pierce cables and pipes. Flooding can be avoided by ensuring that there is appropriate pumping equipment so that any water that seeps into the excavation can be easily pumped out to a safe area.

When the housing market is buoyant there’s usually a high demand for building services, making it hard to find good builders at a reasonable price. It can be tempting to pick the cheapest builder who can start next week, but if a quote price is super-cheap there’s normally a good reason: perhaps they forgot to include something, or simply just got their sums wrong. Either way, the builder will realise they’re working at a loss. And if they walk off the job, it will cost you dearly to get someone else to finish it, with all the hassle that goes with that. It may be cheaper in the long run to go for a medium-range price rather than risk work being skimped to recoup losses, leaving you with a badly done job. If your project is not time critical, employing ‘friends of friends’ or friends on ‘mates’ rates’ may work. But more often than not something else will come up on the day when they promised to finish your job, which could then hold up the following trades.

Accidents involving construction vehicles, such as dump trucks or backhoe loaders, are a common hazard of trenching sites. Mobile equipment operators might have an obstructed view and therefore not be able to detect when they are approaching the perimeter of the trench. OSHA suggests that a spotter or a flagger be designated to direct the mobile equipment operator and prevent the vehicle from falling in the trench. When material is being loaded or unloaded from the construction vehicle, workers should be required to stand back in order to prevent being hit by flying debris. Read extra information at Construction services Fort Collins.

How wide should a retaining wall trench be? The trench you are going to build your retaining wall in should be wide, deep, and level. Size the trench so there’s enough room for the block and at least 8 inches of space behind it. Excavate deep enough to completely bury at least one full course, including space for 6 to 8 inches of base material. Establish a level trench to ensure an even layer of base material. That will help prevent the wall from tipping after freeze/thaw cycles. Our experts use a laser level and a story pole to determine the depth of the trench.DON’T forget to allow for drainage. Groundwater is the natural enemy of retaining walls. When it saturates clay-type soils, they swell and put excessive pressure on the backside of the wall. To avoid failure, make drainage provisions at the same time as you go about building the retaining wall. Backfilling the space behind the blocks with crushed stone and then installing a flexible perforated drainpipe (available at The Home Depot), also called “drain tile,” at the base of the wall could create the necessary escape route for groundwater. The perforated pipe will carry groundwater to each end of the wall where it can drain harmlessly away. The ends of the drainpipe should then exit on each end of the wall, and you may cover them with crushed stone to camouflage their appearance.

Block retaining walls are lightweight, cost-effective, and easy to build. They come in a wider range of styles and colours and are more versatile than concrete sleepers, creating curves and tiered walls can be achieved with ease. Block retaining walls have a wide footprint so if your access is tight or room on your property is at a premium then blocks would not be for you. See additional details on here.